12547540.doc page: 1/4 Test & Commissioning Electrical: Energizing MCC No of pages /Equipment Item: Issue Date: 11 th Oct., 2008 Rev: R00 Item N ° Sheet No. Checking before Energizing 送前前检查 Erection 安装 MCC cabinets have been erected ; incoming cables have been test and connected the incoming of MCC MCC 柜已安装完成, MCC 进线电缆测试并已连接至 MCC 进线柜 Earthing system for 子 MCC is installed MCC 接地系统已完成 Lig