Form No. Rev. Date : Page : Date: : LO CA Cont. Consultant DATE Store the Material in the allotted Area. Check the store that are clean, tidy and enough space to accommodate the materials Keep all the hard ware from the contractor in the same store Setting out as per approved lay out. PRE-INSTALLATION Necessary MEP clearance obtained Project Name CHECKED BY ITEM Start installing the carcass panel
橱柜销售手册 1.1吊柜 W WD/U/A/T/B/Z 01 /02/03/04 - 深度高度 - 宽度 单门吊柜(深度 330) WD01(单门) -3370(700高) -300(宽)、350、400、450 WD01(单门) -3380(800 高) -300(宽)、350、400、450 双门吊柜(深度 330) WD02(双门) -(深度) 3370-600/700/ 800 WD02(双门) -(深度) 3380-600/700/ 800 趟门吊柜( 深度 350)配 BM-BT02 WD04-3340-600-----450 高、 750宽 WD04-3340-700----450 高、 1350 宽 WU 翻门折叠门柜 单上翻门吊柜(深度 330) WU01-3335(350 高) -600/700/800/900/1000/1100/1200 WU01-334